What should be noted when using gas generator sets?

2025-05-25


1.The cooling water for the unit must be softened water. 


2. The computer room should be spacious, bright and equipped with exhaust fans to ensure good ventilation. 


3. When installing, the chassis and the foundation should be leveled with flat shims. The contact area should be over 60% and evenly distributed. 


4. The computer room should be kept away from areas with open flames. 


The gas must be desulfurized, dehydrated and dust-removed, with the content of flow rate ≤ 0.25 Nm3 and hydrogen ≤ 10%. 


6. The lighting, switches, wiring and electrical appliances installed indoors should adopt explosion-proof measures and be fixed firmly. 


7. The computer room should comply with fire protection requirements and be equipped with fire extinguishers and other fire-fighting equipment. 


8. Flammable gas alarm devices are installed in the computer room to detect flammable gas leaks in a timely manner. 


For gas engines under 60kw, the external main gas pipeline diameter should be no less than 2 inches, and the part close to the engine should be no 

less than 1 inch. For those over 60kw, the diameters should be 3 inches and 2 inches respectively. Gas valves (stainless steel ball valves), type water 

release valves, and backfire prevention devices must be installed. After the gas pipeline welding is completed, the welding slag should be cleaned

 (with high-pressure air). 


During the operation, strictly follow the above operating procedures to ensure the normal operation of the gas generator set.